U.S. Supreme Court rules for Michigan in its fight to shut down an aging energy pipeline

Apr 22, 2026 - 19:00
 0
U.S. Supreme Court rules for Michigan in its fight to shut down an aging energy pipeline
Fresh nuts, bolts and fittings are ready to be added to the east leg of the pipeline near St. Ignace as Enbridge prepares to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich., on June 8, 2017. L

Justice Sonia Sotomayor wrote for a unanimous court that the Enbridge energy company waited too long to try to move the case to federal court.